Square 77 Renovation

Structural demolition of three 8-story historic brick dormitory buildings directly adjacent to occupied housing, student union, and cultural activities center while retaining original street-side facades.  Controlled demolition of upper floors and separation from façade-retention areas was performed using Brokk robotic demolition tools prior to access with extended- reach excavator(s).  Work included shoring and bracing of existing structures to control demolition activities, asbestos abatement, and extensive traffic-control and flagging/safety operations to allow activities to proceed without endangering heavy student and faculty/facility traffic.

No Comments Yet.

Leave a comment

You must be Logged in to post a comment.